High rise construction cranes are the backbone of modern urban development, allowing cities to grow upwards with precision and speed. These towering machines can lift massive loads, often weighing over 10 tons, with ease.
They come in various types, including hammerhead, luffing jib, and fixed cranes, each designed to tackle specific construction challenges. The hammerhead crane, for instance, is ideal for building complex structures with multiple elevations.
The tallest high rise construction crane ever built stood at 262 meters tall, a staggering feat of engineering that redefined the possibilities of urban construction.
High-Rise Construction
High-rise buildings can reach heights of over 1,000 feet, requiring specialized construction equipment like cranes to lift heavy materials into place.
The tallest crane ever built was the 1,250-foot-tall crane used in the construction of the Burj Khalifa in Dubai.
High-rise construction often involves complex engineering and planning to ensure the building's stability and safety.
In some cases, cranes can take up to a year to assemble and install, and are often left in place for the duration of the project.
To mitigate the risk of accidents, construction sites must adhere to strict safety protocols and regulations.
Cranes and Safety
Determining the weight of the load is the first step in planning a lift, and it's crucial to safe construction crane operations.
A true understanding of load limits is critical to keeping crane jobs safe.
Inaccurate load calculations can lead to serious accidents, so it's essential to get it right.
Tower Crane Parts
Tower cranes are incredibly complex machines, but they're made up of just three main parts: the base, the mast or tower, and the slewing unit. The base is the main support of the crane, connected to a large concrete foundation that carries the entire weight.
The mast is connected to the base and gives the crane its height. It's made up of a large triangulated lattice structure, which gives the crane its strength.
The slewing unit is attached to the top of the mast and allows the crane to rotate along its axis. It's made up of three parts: the jib or working arm, the machinery arm, and the operator's cabin.
For more insights, see: Tower Cranes
The jib or working arm is a horizontal element that carries the load, with a trolley that runs along its length to move the load in and out.
The machinery arm is a shorter horizontal element that holds the load-lifting motor, electronic controls, the cable drum, and concrete counterweights to keep balance.
The operator's cabin is where the operator handles all the functions of the crane.
Here's a breakdown of the slewing unit's three parts:
- Jib or working arm: A horizontal element that carries the load, with a trolley that runs along its length to move the load in and out.
- Machinery arm: A shorter horizontal element that holds the load-lifting motor. It also contains electronic controls, the cable drum, and concrete counterweights to keep balance.
- Operator’s cabin: Consists of the space in which the operator handles all the functions of the crane.
Crane Safety Depends on Load Weight
A true understanding of load limits is critical to safe construction crane operations. The weight of the load plays a key role in keeping crane jobs safe.
The maximum lifting power of a typical tower crane is 19.8 tons or 18 metric tons. This means that the crane can only lift loads up to this weight safely.
To prevent overloading, operators have two limit switches: a maximum load switch to stay below 18 metric tons, and a maximum moment switch to protect the crane from the load's bending force.
A load that's positioned at the end of the jib can't be lifted as safely as one closer to the mast. The closer the load is to the mast, the more weight the crane can lift safely.
Here's a quick summary of the crane's lifting power:
Weather monitoring is also crucial when using tower cranes. Strong gusts of wind can destabilize the load and structure, causing a collapse.
Tower Crane Support System
Tower cranes are incredibly stable structures, but it's fascinating to learn how they manage to stand upright. The concrete pad, which is a 30x30x4 feet (10x10x1.3 meters) foundation made by the construction company, provides a solid base for the crane. Large anchor bolts deeply embedded in the concrete pad support the base of the crane.
The crane is delivered to the construction site in parts, which are then assembled on-site by qualified installers. The jib and machinery section are assembled and positioned on the mast, which is only 40 feet tall initially.
The mast remains upright thanks to its triangulated structure. To increase the crane height, the crew adds sections to the mast with a climbing frame, a process that's repeated continuously until the desired height is achieved.
Here's a step-by-step overview of the mast extension process:
- A weight is hung on the jib to balance the counterweight.
- The slewing unit is detached from the top of the mast and hydraulic rams in the top climber push the slewing unit up 20 feet.
- The crane operator uses the crane to lift another 20 ft mast section into the gap and then it is bolted in place.
Tadano AC 7.450-1 in Wisconsin
In Wisconsin, a Tadano AC 7.450-1 mobile crane was put to the test during the construction of a 44-story mixed-use building in Milwaukee. This crane performed double duty, showcasing its versatility.
The contractor, Findorff, had a unique opportunity to demonstrate the capabilities of this crane.
Expert Advice and Resources
If you're planning a high-rise construction project, consider hiring a crane operator with at least 5 years of experience to ensure safe and efficient operations.
Crane manufacturers like Liebherr and Terex offer a range of high-rise construction cranes with lifting capacities from 20 to 1,600 tons.
The American Society of Civil Engineers recommends regular inspections and maintenance to prevent crane accidents.
A well-designed crane foundation is crucial to prevent settlement and ensure stability.
High-rise construction cranes can be powered by diesel or electric motors, with electric motors being more environmentally friendly.
The Federal Highway Administration requires crane operators to complete a training program and obtain a certification within 5 years of initial certification.
For your interest: Carry Deck Crane Certification
Sources
- https://www.constructionbriefing.com/news/highrise-construction-cranes-towering-above/1138281.article
- https://www.ny-engineers.com/blog/the-role-of-tower-cranes-in-high-rise-building-projects
- https://slate.com/human-interest/2012/05/tower-crane-building-one-world-trade-center-how-do-cranes-get-on-top-of-skyscrapers.html
- https://www.linkedin.com/pulse/high-rise-building-tower-cranes-market-size-scope-key-xvike
- https://www.craneequipmentguide.com/article/56729-two-tower-cranes-on-small-lot-build-minneapolis-next-great-high-rise-project
Featured Images: pexels.com